Factory 52B, 37-39 East Street,
Daylesford VIC 3460
Stressed by the lack of building timber?
SPA SIPs are the perfect solution to this timber shortage crisis as very little timber is needed compared with standard timber framed houses.
SPA houses are also very fast to construct as lock up can be achieved in as little as 5 weeks following deposit payment and signing of shop drawings. Conditions apply.